More photos from Max.


This entry was posted
on Friday, July 28th, 2006 at 4:31 pm and is filed under General.
You can follow any responses to this entry through the RSS 2.0 feed.
You can skip to the end and leave a response. Pinging is currently not allowed.
July 29th, 2006 at 8:29 pm
Looks like whatever we spent on all that brick paving, which I believe was done only last spring, was a waste.
July 31st, 2006 at 8:45 pm
The brickwork was put in in two stages. The first was 4 years ago, and the second was 2 years ago. Neither was paid for by the Association. Both the phases were entirely paid by the EE Volunteers, at absolutely NO cost to the Association.
When the last brickwork was done, 2 years ago, no one had any concept of a ramada cover.
There will be damage to the brickwork, without question, but it cant be helped. The bricks themselves will be reused.